Work continues in full swing at the welding station. Our brave welders are enthusiastically building the ACV-26R3-11 cement bulk trailer.

Now it's time for the pipeline network and compressor station.

As a reminder, the cement bulk trailer will have a twin hopper with a capacity of 26 m3. A standalone compressor station, driven by a diesel engine and equipped with a range of air filters, will handle the pneumatic loading and unloading of cement.

There's still a lot of work to be done, so we'll be keeping a close eye on the manufacturing process.