The final stage in the construction of the first of two ACV-17R1 cement trucks is the installation of the hopper on the chassis.
The installation of the tank on the chassis must be carried out with meticulous precision, ensuring every bolt fits seamlessly. Try using a standard forklift to load a drum weighing over three tons with the same ease as our technicians. It's important not to scratch or damage the exterior of the freshly painted hopper in any way.
Now all that remains is to connect all the components and wait for the second cement truck to be ready.